# Routing gates — final disposition (rev C5.2). This message supersedes the 11-item disposition and the "six corrections" reply; work from this one only.

Your "Bounded Routing Gate Correction" was written against the 11-item message, which is why it still carries the 3.0 mm mains floor and the S/M net-selective regions. Both are withdrawn below. Nothing here asks you to bypass isolation; every change is explained with the geometry that makes it safe. Coordinates: project frame, Flux = project − (40, 24.5). The attached rules MD (rev C5.2) and delta CSV match this message.

**1. Regions S and M: stop trying to implement them — they are already satisfied by construction.** The four all-layer copper keep-outs you hold (X 37–41.5 / Y 3.5–46; X 30–46.5 / Y 0–3.5; X 30–41.5 / Y 3.5–6; X 33–46.5 / Y 46–49) form a continuous copper-free wall from Y 0 to Y 49. I checked the netlist against the placement: **no MDN-100 net has pads on both sides of that wall** (the only nets that touch both sides are through D13/D14/R67, which are not on this board). So the router cannot put SELV copper west of the wall or mains copper east of it — there is no pad to reach and no path to get there. That is exactly what S and M specify (mains copper ≤ X 37.0 / 30.0 / 33.0; SELV copper ≥ 41.5 / 46.5; nothing under the PS1 primary half). The S/M text in the rules is the *specification*; your four zones are its *implementation*, and I accept them as equivalent. The "PS1 pin-4 exception" is gone with the corrected pin positions (pad ends at X 36.1). Keep the barrier band X 38–41 copper-free as it is. I verify creepage on the Gerbers myself — no creepage engine is needed.

**2. PS1 pins 1–4: set the MAINS net class clearance to 1.0 mm, and delete every mains pad-pair waiver attempt.** The four pins are excluded only because the class carries a 3.0 mm clearance and the module's own pads sit 2.2–2.4 mm apart (pin 2↔3 included — the 2.4 mm pair you found is why pair waivers were never the right tool). MAINS class: track 1.0 mm minimum / 1.5 mm preferred, **clearance 1.0 mm to everything**, solid (no thermal relief), no pours. That is functional insulation between L and N — a short there opens F1 — and the mains-to-SELV distance is carried by the wall in item 1 (≥ 4.5 mm straight, > 9 mm around either slot end), not by a clearance number. Remove the "mains 3.0 mm floor" and "mains-track 3.2 mm" rulesets; 3.2 mm between the L/N/VCAP traces is a routing *target* that I check afterwards. The L/N computed width of 1.0 mm with a 1.5 mm declaration needs no reconciliation: 1.0 minimum, 1.5 preferred is the intent. After this one change, re-run preflight: if any PS1 pin is still excluded, report the rule it names and stop.

**3. TP24 — your diagnosis is right; it moves.** The J4 locator hole at (44.46, 40.0) was missing from my model (my J4 footprint had only the six pads); I have added the three Ø 0.99 holes and a 0.3 mm pad-to-hole rule, and it caught a second one: **FID6 at (50.0, 39.4) is 0.2 mm into the hole at (49.54, 38.73).** Moves (both bottom, 0°): **TP24 → (44.8, 42.6)** [Flux (4.8, 18.1)], **FID6 → (47.6, 43.5)** [Flux (7.6, 19.0)]. TP24 is now outside the J4 courtyard; FID6 gets a Ø 3 mm copper-free ring and no silk within 3 mm, like the other five fiducials. Nothing else moves except item 5.

**4. RV1 / C1 top housing zones — no own-pad exemption needed.** Move the RV1 zone's lower edge from Y 25.5 to **Y 25.7** (the pads end at Y 25.6); the C1 zone already clears its pads (they end at Y 27.1, zone starts at 27.5). Both parts are fed from the −Y side, so a plain blanket top keep-out is correct.

**5. The ten zone-check errors.** C2 was real — its courtyard corner at (46.3, 3.0) entered the bottom-bridge zone — and the 12 V MLCC bank moves +0.3 mm in X: **C2/C3 → X 48.8, C4/C5 → X 53.5, C36/C37 (DNP) → X 58.2**, Y unchanged (4.2 / 6.9), bottom, 0°. The other nine are bodies or cut-outs inside *copper* keep-outs and are waived here by name: C1 ×3 (own housing zone; the insulated can reaching X 37.75 into the slot band and Y 48.0 into the top-bridge zone), RV1 ×2 (own housing zone; the pad-tip intrusion is fixed by item 4), PS1 ×1 and CY1 ×1 (bodies straddling the slot by design), slot object ×2 (the cutout inside its own band). If the zones can be limited to copper primitives (pads, tracks, vias, fills), do it and they vanish; otherwise they stay recorded as waived.

**6. GND: delete any board-wide GND plane (that is the "empty plane" Info) and draw these three pours instead.**

| # | Layer | Net | Polygon (project mm) | Notes |
|---|---|---|---|---|
| P1 | bottom | GND | (46.5, 0.4) (79.6, 0.4) (79.6, 48.6) (46.5, 48.6) (46.5, 46.0) (41.5, 46.0) (41.5, 3.5) (46.5, 3.5) | SELV return; fill keep-out X 49.7–50.3 / Y 30.5–37.0 (the slit); 0.3 mm to the slot rim; the Ø 7 hole keep-outs and the Ø 3 fiducial rings apply |
| P2 | top | GND | (43.5, 23.7) (56.0, 23.7) (56.0, 35.0) (43.5, 35.0) | buck hot-loop pocket, sized so U1 pin 4 (55.23, 30.80) connects into it — that is its ≥ 30 mm² copper; 4 vias to P1 beside pin 4 |
| P3 | top | GND | (66.65, 15.65) (79.65, 15.65) (79.65, 29.35) (66.65, 29.35) | under U5; ≥ 8 stitching vias to P1 between the centre pads |

No pour of any net west of X 41.5 (bottom) or X 43.5 (top). Thermal relief default on SELV pads; solid on the U5 centre pads and the C6/C11 GND pads. Also **delete the GND via on the mains side at Flux (−14.772, −2.495) = project (25.2, 22.0)** and any other non-mains copper west of the wall that no rule above authored.

**Closed, not gates:** U2/U3 silk circles (cosmetic; silkscreen pass after routing); J1 body 0.47 mm outboard (intended); RV1/QR proxy (void — the label is on the mains-side underside); U4 placement (final); D15 inside the J4 plug envelope (0.7 mm tall, ≤ 1 mm allowed); SRC_PTC (correctly absent); provisional PS1 drills (gate fabrication, not routing). The buck-pocket and J4-courtyard net lists stay guidance; I check them on the routed board.

**Then route.** Expected preflight after items 2–6: the four shared-pad warnings only. Order: mains traces as specified in the rules MD (each a defined 1.0–1.5 mm trace, no pours, no vias); buck hot loop and SW stub (top only, no vias, ≤ 10 mm); DIM surge path J2 → F2 → D1 → R62 at ≥ 0.5 mm; analog stage and SETPOINT (≤ 12 mm, tented vias); U5 fan-out (0.2–0.3 mm, ≤ 12 mm, only GND vias under the module); everything else; then P1–P3 and the stitching. Deliver with the routed lengths of SW, VIN (C6 → U4 pin 3), SETPOINT, PWM_DIM and DIM+ (J2 → F2 → D1), the DRC summary, and a list of any rule you had to relax, with the number. No further approval is needed for the routing pass.